THE ENVIRO-FOAM RESOURCE CENTER

A better-informed
way to build.

Practical answers for a warmer, more efficient space. From your first idea to the details behind the drywall.

PRACTICAL GUIDES

The details behind
a better project.

Understand the material, prepare the building, and know which questions to ask before anything gets covered.

Cellulose, fiberglass & spray foam for attics Preparing for spray foam Ventilation, fire barriers & hybrid insulation Crawlspace encapsulation & code pathways Injection foam & existing walls Energy audits & blower door testing

01 / START WITH YOUR LOCATION

Same north woods.
Different code details.

Residential guidance for the Upper Peninsula and Wisconsin. Choose where you’re building.

SOURCE CHECK: NOVEMBER 14, 2026 · Read the dated status before relying on a code edition.

RESIDENTIAL CODE STATUS

The 2021 residential update is still on hold.

LARA currently identifies the adopted 2015 residential framework as remaining in effect while the court’s order prevents implementation of the proposed 2021 residential and residential-energy rules. The August 27, 2025 order stayed the planned August 29 effective date until further court order.

Michigan’s commercial energy code has a separate adoption history. A commercial building needs its own review.

MICHIGAN CLIMATE ZONE6A

Michigan’s adopted county table applies. The Upper Peninsula spans two zones.

See the county groups

6A: Alger, Delta, Dickinson, Marquette, Menominee.

7: Baraga, Chippewa, Gogebic, Houghton, Iron, Keweenaw, Luce, Mackinac, Ontonagon, Schoolcraft.

MICHIGAN / ZONE 6A

Typical prescriptive minimums

Selected insulation components for new residential work. Your approved compliance path and assembly details control.

Selected Michigan zone 6A insulation minimums
ComponentInsulation R-value

“13 + 5” means cavity insulation plus a separate insulating layer. A slash indicates alternatives, not addition. Floor and foundation exceptions and other approved paths may apply.

Michigan tables N1101.10 and N1102.1.1
Existing house? Adding heat? Business or farm?Find out which code rules apply to your project →

Use this guide to plan questions, not to certify a design. Permit timing, building type, existing conditions, equipment, and the selected compliance method can change the requirements. Confirm the project’s path with the local building department.

BEFORE YOU CHOOSE AN R-VALUE

Which rules apply
to your project?

Start with the building’s actual use, what you’re changing, and whether the space will be heated or cooled. Then choose an accepted way to demonstrate compliance.

THE SPECIFIED-VALUES ROUTE

Prescriptive

Meet the listed insulation R-values, window U-factors, and other requirements for each component, using any applicable exceptions. It is the straightforward checklist approach.

BALANCE THE ENCLOSURE

Envelope trade-off

A total-UA calculation compares heat loss through the complete enclosure. Better windows or another better-insulated component may offset a weaker one within the rules. This is not a furnace-efficiency trade-off.

MODEL THE BUILDING

Performance

Approved software compares the proposed design with a code-defined reference building. The report must satisfy the adopted method and match the work installed. Mandatory provisions and other safety requirements still apply.

You must meet the applicable energy code, but an approved alternative can allow a design that differs from individual prescriptive R-values. Spray foam’s air sealing does not, by itself, authorize a lower R-value.

ICC explanation of residential paths · DOE: total-UA / REScheck · Wisconsin SPS 322.31 and 322.50–53

02 / THE DETAILS PEOPLE ASK ABOUT

When can you
use less than R-49?

These are specific exceptions with conditions. A low roof or a vaulted ceiling does not automatically qualify.

R-49

The usual starting point

The standard prescriptive ceiling value in the U.P. and Wisconsin. More insulation can be a design choice; the minimum is not an energy-savings guarantee.

R-38

Enough room at the eaves

Michigan permits R-38 across the entire ceiling area requiring insulation when full, uncompressed R-38 also extends over the exterior-wall top plates at the eaves.

A thin or compressed edge does not meet this condition.

R-30

Limited, space-constrained ceilings

A ceiling without attic space may qualify when the assembly cannot fit the otherwise-required insulation.

Michigan: no more than 500 sq ft or 20% of the total insulated ceiling area, whichever is smaller.

TRY THE AREA LIMIT

How much ceiling
could fit the exception?

This checks area only. The assembly still must qualify, and required ventilation space must be preserved.

MICHIGAN SELECTEDChange state

Michigan: N1102.2.1–2 / R402.2.1–2. These reductions do not apply to the U-factor or total-UA alternatives. State-code summary from Otsego County (PDF) · 2015 IECC ceiling provisions

What about “just fill the existing cavity”?

Michigan separately provides an alteration exception for existing ceiling, wall, or floor cavities exposed during construction and filled with insulation, provided energy use is not increased. This is not the R-30 area exception and is not a blanket rule for new construction. N1101.3.1, exception 3.

03 / TAKE THE MYSTERY OUT OF THE LANGUAGE

What do those
words actually mean?

A few useful distinctions before you compare products or quotes.

01

Cavity insulation

Insulation in the spaces between studs, joists, or rafters. The framing interrupts the insulation layer. Spray foam between studs is still cavity insulation.

02

Continuous insulation

A layer running across structural members, with only permitted interruptions such as fasteners and service openings. It can sit inside, outside, or within an assembly.

03

Wood-frame vs. mass wall

Wood-frame walls use wood studs. Mass walls include qualifying concrete, masonry, ICF, and solid log assemblies. Brick veneer over studs does not make a mass wall.

04

R-value vs. U-factor

R-value describes resistance to heat flow; higher means more resistance. U-factor describes heat transfer; lower means less. A whole wall also includes framing and other heat-flow paths.

05

Air vs. vapor control

An air barrier controls air movement. A vapor retarder limits diffusion through materials. Neither term automatically means waterproofing, and a ground vapor barrier does not fix bulk-water entry.

06

The thermal envelope

The boundary around heated or cooled space. In one attic it follows the ceiling; in another, the roofline. Choosing that boundary is part of designing the assembly.

A ROOM’S NAME DOESN’T SET ITS WALL REQUIREMENT

Above grade. Below grade.
And the walkout in between.

Grade is the adjacent ground level. Energy-code classification also considers how much wall area is buried and what space it encloses.

Michigan: the residential energy definition treats a wall enclosing conditioned space as a basement wall when at least half is below grade. A mostly exposed walkout wall can fall under above-grade requirements. Evaluate the relevant wall areas with the official.

“Mass wall” describes the construction; “basement wall” describes its location and enclosure role. These labels are not interchangeable.

Residential energy definitions

BEFORE THE WALLS CLOSE UP

Ready for
spray foam?

Wall-top blocking. Vent channels. Inspections. Windows, boxes, and accessible cavities. Jesse’s field checklist covers the details that are easy to miss.

Open the preparation guide Ventilation, fire barriers & hybrid insulation

04 / WHEREVER YOU ARE IN THE PROJECT

A little planning.
A smoother installation.

BEFORE YOU BUILD

Make room for the details.

  • Identify the county, code edition, and compliance path.
  • Decide whether the thermal boundary follows the ceiling or roof.
  • Plan eave depth, ventilation, access hatches, and service routes before framing locks them in.
  • Send plans and goals early enough to coordinate the assembly.
UPGRADING AN EXISTING HOME

Look at what’s there first.

  • Note drafts, cold rooms, moisture, and uneven temperatures.
  • Resolve roof leaks or bulk-water problems before covering them.
  • Plan attic air sealing before adding insulation; keep ventilation paths clear.
  • Review old insulation, wiring, bath-fan exhaust, and safe access.
GETTING READY FOR OUR CREW

Agree on the scope.

  • Confirm what is being insulated, removed, protected, and finished.
  • Discuss piers, debris, crawlspace height, and access restrictions.
  • Coordinate inspections and work by other trades.
  • For spray foam, follow the project’s manufacturer-based ventilation and re-entry instructions.

Attic planning background: DOE/PNNL vented-attic guide. Every scope is confirmed for the actual project.

05 / FREQUENTLY ASKED

Let’s clear
a few things up.

Ask about your project
When do I have to meet the prescriptive insulation values?+

Use the prescriptive values when that is the project’s approved compliance method and no specific exception applies. New conditioned construction and additions generally need energy-code compliance. An accepted total-UA or performance design may use different component values; it needs the required calculations and approval, not just a contractor’s opinion. Compare the three approaches.

Michigan: use Michigan’s amended requirements and accepted compliance documentation. The residential code also provides a separate Energy Rating Index route. Michigan energy provisions, N1105–N1106.

What if I’m insulating an existing home?+

Michigan: an alteration generally brings the work being changed into compliance without requiring untouched portions of the house to meet new-construction standards. Specific exceptions include existing exposed ceiling, wall, or floor cavities filled with insulation, and work where existing cavities remain unexposed, provided building energy use is not increased. These are alteration exceptions—not permission to underinsulate a new addition. N1101.3.1 and its exceptions.

Describe what will be opened, replaced, or newly enclosed when you request the permit review. An attic top-up, a stripped wall, and a converted garage can have different obligations.

What if I turn an unconditioned space into heated or cooled space?+

Michigan: converting an unconditioned or low-energy space to conditioned space triggers the residential energy code’s change-in-conditioning requirements. Review the enclosure around the converted space, not just the surface receiving new insulation. An accepted performance route may provide flexibility. Do not assume the ordinary existing-cavity exception settles a garage, attic, or workshop conversion. DOE/PNNL explanation of the 2015 conversion provisions.

Tell us the intended temperature and use before selecting insulation. Air sealing, ventilation, moisture control, and fire protection belong in the conversion plan too.

Does residential or commercial use change the requirements?+

Michigan: yes. The residential update remains stayed; LARA lists the 2015 residential framework and the separate 2021 commercial energy code, effective April 22, 2025. Also, building-code and energy-code labels do not always match: some low-rise multifamily buildings use residential energy provisions while their construction is under the Michigan Building Code. Confirm occupancy and energy-code scope before using a house insulation table. LARA code list · Michigan residential-energy scope and paths.

For existing commercial buildings, alteration rules generally focus on the work changed; new envelope assemblies and changes in use can trigger additional requirements. 2021 IECC C503–C505.

Does agricultural zoning or a pole-building design make it exempt?+

No automatic exemption. The actual use of the building matters. Agricultural zoning and post-frame construction do not establish an exemption by themselves.

Michigan: the statutory exclusion concerns a building incidental to agricultural use of the land, provided it is not used in retail trade. A house or unrelated business on farm-zoned land does not become exempt just because of the parcel’s zoning. MCL 125.1502a(1)(g).

Have the building department confirm the exemption for the intended use. Zoning, electrical, plumbing, mechanical, and other applicable requirements still need their own review.

Does R-25 foam make any roof a compliant “hot roof”?+

No. Condensation-control insulation and total energy-code insulation are different checks. The 2015 IRC table lists R-25 for zone 6 and R-30 for zone 7 in applicable unvented assemblies; those values do not replace total insulation requirements. Ventilation, vapor control, and the assembly’s layers still need review. IRC R806.5.

Is filling a stud bay with foam “continuous insulation”?+

No. The studs interrupt that layer. Continuous insulation crosses the framing. The material name does not change that distinction.

Does a higher R-value fix air leaks?+

Not by itself. Insulation and air sealing do different jobs. Attic penetrations, hatches, and transitions need attention along with insulation coverage. DOE attic air-sealing guide.

Does a vapor barrier solve a wet crawlspace?+

A ground membrane addresses ground vapor. Drainage, leaks, groundwater, humidity, and the location of the thermal boundary still need to be evaluated. A liner-only price is not a complete moisture-remediation design. DOE/PNNL foundation guidance.

Do I need a coating over exposed spray foam?+

The answer depends on the space, access and use, product, and tested assembly. Thermal barriers and ignition barriers have different roles. A product’s fire test is not blanket permission to leave foam exposed; the final scope must identify the required protection. Manufacturer technical documents.

Can the online price tell me whether my design meets code?+

No. It prices the dimensions and material level you choose. It cannot determine the approved compliance path, inspect a roof assembly, or confirm local requirements. We review those details before setting the final scope.

How much will this save on my energy bills?+

There is no honest universal percentage. Existing insulation, leakage, heating equipment, weather, and how you use the building all affect the outcome. Jesse is a BPI energy auditor and building analyst. Our energy audits and blower door testing can help you understand the building and prioritize improvements. DOE guide to home-energy assessments (PDF).

What photos and measurements are useful?+

Send the project town, approximate dimensions, a wide view, close-ups of framing or obstructions, and the access point. Roof pitch, cavity depth, crawlspace height, piers, and known moisture issues are especially helpful. Measure only areas you can reach safely.

Is cellulose or fiberglass better for my attic?+

For a flat, vented attic, we often start with cellulose for value and coverage. Fiberglass can be preferable where ceiling weight or an approved cavity installation favors it. Closed-cell foam offers compact insulation and air control at a higher cost. Our attic material guide explains settling, weight, slopes, and air barriers.

Will cellulose settling reduce the R-value I paid for?+

We plan the installation using the selected product’s initial thickness and required material quantity, with its settled depth already accounted for. The goal is the labeled long-term R-value. See how settling is included.

06 / WORTH A LOOK

Field notes &
industry updates.

A curated reading shelf, checked November 14, 2026. Publication, meeting, or check dates are labeled; these are not a live news feed.

WISCONSIN / RESIDENTIAL CODE WATCHCHECKED NOVEMBER 14, 2026

Dwelling-code update is still being drafted

The November 11 council packet includes draft July 23 minutes recommending the 2024 IRC, with Wisconsin modifications, as a drafting basis. That recommendation does not put a new code into effect.

For current projects, continue planning under the applicable SPS 320–325 rules. We have not verified a replacement effective date.

Read the council packetCheck official rule status
PRODUCT DOCUMENTATION

Heatlok HFO Pro listing reissued

ICC-ES reissued ESL-1372 for a specified closed-cell-foam wall assembly. It is a useful reminder to read the actual assembly conditions behind a product’s test listing.

Read the ICC-ES listing
INSULATION INDUSTRY

New fiberglass capacity planned

Owens Corning’s update describes a Kansas City production line planned for 2027, following its September 2025 announcement. The article does not establish future local pricing or availability.

Read the manufacturer’s update
EVERGREEN READINGPROJECT PLANNING

Air seal before you insulate

DOE’s attic guide explains why penetrations and transitions deserve attention before new insulation hides them. A useful starting point for an attic upgrade.

Read the DOE guide

Industry links are for context, not endorsements or approval of a product for your particular building.

PUT THE INFORMATION TO WORK

Let’s look at
your actual space.

Bring your questions, plans, or a few photos. We’ll help turn the details into a clear scope.

Talk to Enviro-FOAMTry the cost calculator
Call JesseGet a ballpark